Herbicide contamination from agriculture is a major issue worldwide, and has been identified as a threat to freshwater and marine environments in the Great Barrier Reef World Heritage Area in Australia. The triazine herbicides are of particular concern because of potential adverse effects, both on photosynthetic organisms and upon vertebrate development. To date a number of bioremediation strategies have been proposed for triazine herbicides, but are unlikely to be implemented due to their reliance upon the release of genetically modified organisms. We propose an alternative strategy using a free-enzyme bioremediant, which is unconstrained by the issues surrounding the use of live organisms. Here we report an initial field trial with an enzyme-based product, demonstrating that the technology is technically capable of remediating water bodies contaminated with the most common triazine herbicide, atrazine.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This joint DPI/Burdekin Shire Council project assessed the efficacy of a pilot-scale biological remediation system to recover Nitrogen (N) and Phosphorous (P) nutrients from secondary treated municipal wastewater at the Ayr Sewage Treatment Plant. Additionally, this study considered potential commercial uses for by-products from the treatment system. Knowledge gained from this study can provide directions for implementing a larger-scale final effluent treatment protocol on site at the Ayr plant. Trials were conducted over 10 months and assessed nutrient removal from duckweed-based treatments and an algae/fish treatment – both as sequential and as stand-alone treatment systems. A 42.3% reduction in Total N was found through the sequential treatment system (duckweed followed by algae/fish treatment) after 6.6 days Effluent Retention Time (E.R.T.). However, duckweed treatment was responsible for the majority of this nutrient recovery (7.8 times more effective than algae/fish treatment). Likewise, Total P reduction (15.75% reduction after 6.6 days E.R.T.) was twice as great in the duckweed treatment. A phytoplankton bloom, which developed in the algae/fish tanks, reduced nutrient recovery in this treatment. A second trial tested whether the addition of fish enhanced duckweed treatment by evaluating systems with and without fish. After four weeks operation, low DO under the duckweed blanket caused fish mortalities. Decomposition of these fish led to an additional organic load and this was reflected in a breakdown of nitrogen species that showed an increase in organic nitrogen. However, the Dissolved Inorganic Nitrogen (DIN: ammonia, nitrite and nitrate) removal was similar between treatments with and without fish (57% and 59% DIN removal from incoming, respectively). Overall, three effluent residence times were evaluated using duckweed-based treatments; i.e. 3.5 days, 5.5 days and 10.4 days. Total N removal was 37.5%, 55.7% and 70.3%, respectively. The 10.4-day E.R.T. trial, however, was evaluated by sequential nutrient removal through the duckweed-minus-fish treatment followed by the duckweed-plus-fish treatment. Therefore, the 70.3% Total N removal was lower than could have been achieved at this retention time due to the abovementioned fish mortalities. Phosphorous removal from duckweed treatments was greatest after 10.4-days E.R.T. (13.6%). Plant uptake was considered the most important mechanism for this P removal since there was no clay substrate in the plastic tanks that could have contributed to P absorption as part of the natural phosphorous cycle. Duckweed inhibited phytoplankton production (therefore reducing T.S.S) and maintained pH close to neutral. DO beneath the duckweed blanket fell to below 1ppm; however, this did not limit plant production. If fish are to be used as part of the duckweed treatment, air-uplifts can be installed that maintain DO levels without disturbing surface waters. Duckweed grown in the treatments doubled its biomass on average every 5.7 days. On a per-surface area basis, 1.23kg/m2 was harvested weekly. Moisture content of duckweed was 92%, equating to a total dry weight harvest of 0.098kg/m2/week. Nutrient analysis of dried duckweed gave an N content of 6.67% and a P content of 1.27%. According to semi-quantitative analyses, harvested duckweed contained no residual elements from the effluent stream that were greater than ANZECC toxicant guidelines proposed for aquaculture. In addition, jade perch, a local aquaculture species, actively consumed and gained weight on harvested duckweed, suggesting potential for large-scale fish production using by-products from the effluent treatment process. This suggests that a duckweed-based system may be one viable option for tertiary treatment of Ayr municipal wastewater. The tertiary detention lagoon proposed by the Burdekin Shire Council, consisting of six bays approximately 290 x 35 metres (x 1.5 metres deep), would be suitable for duckweed culture with minor modification to facilitate the efficient distribution of duckweed plants across the entire available growing surface (such as floating containment grids). The effluent residence time resulting from this proposed configuration (~30 days) should be adequate to recover most effluent nutrients (certainly N) based on the current trial. Duckweed harvest techniques on this scale, however, need to be further investigated. Based on duckweed production in the current trial (1.23kg/m2/week), a weekly harvest of approximately 75 000kg (wet weight) could be expected from the proposed lagoon configuration under full duckweed production. A benefit of the proposed multi-bay lagoon is that full lagoon production of duckweed may not be needed to restore effluent to a desirable standard under the present nutrient load, and duckweed treatment may be restricted to certain bays. Restored effluent could be released without risk of contaminating the receiving waterway with duckweed by evacuating water through an internal standpipe located mid-way in the water column.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This article provides a summary of research undertaken in 2000 using finfish to treat prawn farm effluent.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

To experimentally investigate the potential of mixed species polycultures for bioremediation of nutrient rich prawn farm effluent, a series of experiments was performed with banana prawns Penaeus (Fenneropenaeus) merguiensis, sea mullet Mugil cephalus and rabbitfish Siganus nebulosus to determine their compatibilities during particular life stages. Rabbitfish demonstrated a high tendency to prey upon banana prawn juveniles when no other food was available. Mullet of various sizes did not appear to prey upon banana prawn postlarvae (PL16) or juveniles in a fed or unfed environment. The study confirms the good potential for mullet and banana prawn polycultures.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project assessed the efficiency of lotus reducing the amount of nutrients that are generated in a freshwater aquaculture system. Barramundi were produced at a stocking density similar to industry practices. Lotus was grown to determine if it was capable at reducing the nutrient loading from an aquaculture system

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This report provides the results from research undertaken in North Queensland towards recirculation of prawn farm waste waters through bioremediation ponds.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

There are many potential bioremediation approaches that may be suitable for prawn farms in Queensland. Although most share generally accepted bioremediation principles, advocacy for different methods tends to vary widely. This diversity of approach is particularly driven by the availability and knowledge of functional species at different localities around the world. In Australia, little is known about the abilities of many native species in this regard, and translocation and biosecurity issues prevent the use of exotic species that have shown potential in other countries. Species selected must be tolerant of eutrophic conditions and ecological shifts, because prawn pond nutrient levels and pathways can vary with different assemblages of autotrophic and heterotrophic organisms. Generally, they would be included in a constructed ecosystem because of their functional contributions to nutrient cycling and uptake, and to create nutrient sinks in forms of harvestable biomass. Wide salinity, temperature and water quality tolerances are also valuable attributes for selected species due to the sometimes-pronounced effects of environmental extremes, and to provide over-wintering options and adequate safety margins in avoiding mass mortalities. To practically achieve these bioremediation polycultures on a large scale, and in concert with the operations of a prawn farm, methods involving seed production, stock management, and a range of other farm engineering and product handling systems need to be reliably achievable and economically viable. Research funding provided by the Queensland Government through the Aquaculture Industry Development Initiative (AIDI) 2002-04 has enabled a number of technical studies into biological systems to treat prawn farm effluent for recirculation and improved environmental sustainability. AIDI bioremediation research in southern Queensland was based at the Bribie Island Aquaculture Research Centre (BIARC), and was conducted in conjunction with AIDI genetics and selection research, and a Natural Heritage Trust (NHT) funded program (Coast and Clean Seas Project No.717757). This report compilation provides a summary of some of the work conducted within these programs.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

To assess their utility for profitable wastewater bioremediation, banana prawns, Penaeus (Fenneropenaeus) merguiensis (de Man), were stocked at low densities (1 – 5 m-2) and grown without supplemental feeding in five commercial-prawn-farm settlement ponds (0.3 to 6.0 ha). The prawns free-ranged in the variously designed ponds for 160 to 212 days after stocking as PL15. Survival estimates ranged from 12% to 60% with production of 50 – 528 kg ha-1. Over 1150 kg of marketable product was produced in the study. Exceptional growth was monitored at one farm where prawns reached an average size of 17g in 80 days. Nutrients in water flowing into (8 - 40 ML d-1) and out of the settlement pond at that farm were assessed twice weekly along with routine water quality measurements. Only small differences in water qualities were detected between waters running into and out of this settlement pond. Total nitrogen levels gradually increased from 1 - 1.5 mg L-1 early in the season to over 3 mg L-1 towards the end of the season. Total phosphorus levels similarly rose from 0.1 - 0.2 mg L-1 to 0.3 - 0.4 mg L-1 in the middle of the season, but fell to 0.2 – 0.3 mg L-1 towards the end when approximately 12,000 prawns were harvested with a total weight of 175 kg. No significant differences (P > 0.05) were detected in the overall acceptability of prawns harvested from each of the 5 settlement ponds in small-scale consumer sensory analyses. The prawns from settlement ponds were rated similarly to banana prawns grown with commercial diets at two other establishments. Microbiological analyses of prawns from all farms showed bacterial levels to be well within food-grade standards and lower than prawns produced in a normal growout pond. These results demonstrate that high quality food grade banana prawns can be produced in these wastewater treatment systems.